Welcome to National Engginering Works
|
|
Major of our work is carried out
at our workshop cum office near
the port area of Mumbai. |
|
National Engineering Works.
Plot No. /RR No. 120, Behind
Indian Oil Petrol Pump, Mazgaon
Tank Bunder Estate, Reay Road
(West), Mumbai – 400 010.
Tel.: 2373 4724 / 2373 7967
Email:
info@nationalenggworks.com
|
|
|
|
|
|
|
The Major Structural Repairs Carried Out By
Us In the Recent Past.
The major
structural steel renewal includes ship sides
plate, ship bottom plates, main deck plates,
tank top plates, internal bulkheads,
transverse frames, longitudinal frames &
specific components like complete kort
nozzles, modification to existing structure
for up gradation etc.
|
D.B.BADRINATH – 175 TONS STEEL
RENEWAL |
|
NAND HEERA – 60 TONS STEEL RENEWAL |
|
M.V. NISHA – 160 TONS STEEL RENEWAL |
|
NAND PANNA – 20 TONS STEEL RENEWAL |
|
M.V MAYA – 35 TONS STEEL RENEWAL |
|
NAND KRISHNA- 45 TONS STEEL RENEWAL |
|
RAMEY TIDE – 30 TONS STEEL RENEWAL |
|
GARWARE I – 10 TONS STEEL RENEWAL |
|
OIL TERN – 20 TONS STEEL RENEWAL |
|
GARWARE II – 15 TONS STEEL RENEWAL |
|
REGENT SEA HORSE – 25 TONS STEEL
RENEWAL |
|
GARWARE III- 12 TONS STEEL RENEWAL |
|
MALAVIYA ONE – 30 TONS STEEL RENEWAL |
|
GARWARE V – 10 TONS STEEL RENEWAL |
|
MALAVIYA TWO – 30 TONS STEEL RENEWAL |
|
CARRIBEAN PRINCESS – 20 TONS STEEL
RENEWAL |
|
MALAVIYA THREE – 30 TONS STEEL
RENEWAL |
|
ROLLDOCK SUN ( L&T) – 40 TONS STEEL
RENEWAL |
|
MALAVIYA FOUR – 25 TONS STEEL
RENEWAL |
|
MALAVIYA THREE – 70 TONS STEEL
RENEWAL |
|
MALAVIYA TWELVE - 80 TONS STEEL
RENEWAL |
|
|
|
|
Other Major Executed Works in Recent Past: |
Sr. no. |
Vessel Name |
Description |
Company |
|
|
|
|
1) |
OSV Malaviya 1 |
Installed 1 no
Telescopic
Hydraulic Crane
on
Main Deck (10
Ton) Installed 1
no
containerized
Fi-Fi unit
(Class I)
|
Great Offshore |
2) |
OSV Malaviya 2 |
Converted in to
Fi-Fi Class I &
water curtains.
|
Great Offshore |
3) |
OSV Malaviya 3 |
Converted in to
Agni-I, water
curtain.
|
Great Offshore |
4) |
OSV Malaviya 4 |
Converted in to
Fi-Fi Class 1,
water curtains
all
around.
|
Great Offshore |
5) |
OSV Malaviya 6 |
Installed
Telescopic
Hydraulic crane
(6 Tons)
on main deck.
|
Great Offshore |
6) |
OSV Malaviya 11 |
Converted into
Single Fi-Fi
Installed
Telescopic
Hydraulic crane
(10 Tons) on
main deck.
|
Great Offshore |
7) |
OSV Malaviya 12 |
Converted into
Fi-Fi class 1,
with water
curtain
all around.
Stern roller
fabricated,
fitted &
aligned.
|
Great Offshore |
10) |
Barge Gal
Constructor |
Installed New
Hydraulic Crane
(10 Tons) on Aft
for anchor
handling.
Renewed Fast
Rescue
Boat.
|
Great Offshore |
11) |
M.V. Maya |
Derrick Boom (40
Tons) Section
Renewed.
Renewed hatch
coming & lips.
|
Sai Shipping Co.
Pvt. Ltd. |
12) |
M.V. Global
Paramount |
Hydraulic Deck
Crane (40 Tons)
boom
damage section
renewed.
|
Gulf Liner
Shipping
Agency Ltd. |
13) |
M.V. Global
Progress |
Hydraulic Deck
Crane (40 Tons)
boom
damage section
renewed.
|
Gulf Liner
Shipping
Agency Ltd. |
14) |
Nand Heera |
Converted in to
Agni-I, water
curtain.
|
Tag Sea
Logistics |
15) |
Nand Krishna |
Converted in to
Agni-I, water
curtain.
|
Tag Sea
Logistics |
16) |
Malaviya Sixteen |
Removal of
rudder & fitting
back in Of float
Condition
|
Great Offshore |
17) |
Malaviya Twenty
Four |
Fitment Of New
AHT Winch, Stern
Roller
|
Great Offshore |
18) |
Malaviya Three |
50 Persons
Additional
Accommodation
Made
New As Per
Drawings.
|
Great Offshore |
19) |
Rolldock Sun |
Structural ,
Complete Outfit
And Deck
Machineries
Installed &
Commissioned.
|
L&T Hazira |
|
|
Major
Structural Modification
We carry out Major steel
renewals and structural
modification to existing vessel
as per approved drawings
generated by us and certified by
class surveyor with owners
pprovals.
Installation / Commissioning
Jobs
We also undertake, Commissioning
& installation of complete new
fire fighting units on the
vessel.
(Includes making of drawings,
obtaining approvals, providing
equipment & materials with full
class supervision).
Installation / Commissioning
Jobs
We also undertake, Commissioning
& installation of complete new
deck machineries on the vessel
under class supervision.
(Includes making of drawings,
obtaining approvals, providing
equipment & materials with full
class supervision).
Installation Of New / Old
Hydraulic Deck Cranes
(Includes making of drawings,
obtaining approvals, providing
equipment & materials with full
class supervision).
Installation Of New / Old
Hydraulic Engine Room
Machineries
Installation of engines &
generators, shafting, gearboxes
with alignment and trials.
(Includes making of drawings,
obtaining approvals, providing
equipment & materials with
full class supervision). |
Top |
|